Showing posts with label walls. Show all posts
Showing posts with label walls. Show all posts

Taking Shape

Posted: Wednesday, October 21, 2009 –
June 16th found Slick framing up the wall that would close the room off from the living area. Some thought and discussion had to go into this step before he could proceed, as the original builder had (for whatever reason) interrupted the ceiling surface with a low beam. You can see it in the picture below. It runs along behind the top timber of the wall frame.

Installing the semi-constructed wall frame that will separate the bathroom from the living areas.
This beam didn't run in line with the wall of the room to the left. (Of course not, that would be too straightforward and logical.) Instead, it was set back a little more than the width of the wall. This meant that even though we set the wall frame on the outside of the beam (so the beam protruded into the bathroom) the new wall still wasn't quite flush with the old. This caused plastering challenges later on.

  Wedging it in... A few well-aimed kicks helped.
Inside the bathroom, after deciding on framing up the wall outside the beam, we were left with the problem of resolving the beam visually. It looked really odd, one wall jutting out at the top. We ended up figuring 'if you can't beat 'em, join 'em' and built look-alike boxes along the top of the other three walls. This transformed a problem into a stylistic distinction and advantage, saving us from the cornice issue and giving the bathroom an individual look and feel. However, it was painful to accomplish, as anyone versed in the art of plastering could inform you. The next picture will give you a glimpse of what it looked like in progress:

 The box cornice in plastering phase, later in the reno.
You can see that the box cornice surfaces consisted largely of plaster by the time we'd done two concave corners and one converse, with very little between. Blick learned to plaster on this room and she did a good job. (Those lights were the kitchen lights. We were a little short on light in the kitchen for a while!)

  Blick hammering the base of the frame down.
As you can see in most of the above photos, the bottom timber of the wall goes right from wall to wall. Eventually the door into the bathroom was to hang on the right-hand side, so after the wall had been built and secured Dad must have cut out the section of the base plate in the door area.

You may wonder about the pine two-by-fours. They are new, bought cheaply from the discard pile at our local building supply store. The timbers were too full of big knots and other weaknesses to be sold to construction builders who would use them in load or stress bearing situations. The timber was fine for our purposes as we were able to cut out the imperfections and use the timber in relatively low-stress applications. The walls, for instance, basically held up the gyprock, pine panelling and insulation. No major load bearing or lateral strain was being taken. Thus they were ideal for us.

Bathroom Beginnings

Posted: Tuesday, October 20, 2009 –
It is June 15th. Our kitchen has suddenly shrunk. As readers of previous posts have already seen, first a door has been removed, then a window installed. The wall separating the kitchen and dining area has also been removed, unfortunately without a photographic record. Now a completely new wall is being built, cutting the kitchen almost in half.



 
First, the kitchen was half cleaned out, then the wall framed in. Shelves had to be made and furniture, such as the pantry cabinet, fitted back into the remaining kitchen so the cook didn't go quite crazy. Then the panelling was nailed on. This tongue and groove pine panelling was actually bought new. Gyprock recycled from other walls in the house and gyprock bought for a song off the 'damaged pile' then clad the upper walls.


That night, Dad got out the (new) tin of Tongue Oil/Polyurethane mix and put down the first layer of floor sealant.

Oh, I nearly forgot. Speaking of the floor and sealing it, obviously the floor had first to be sanded back. The floorboards, fresh and new when we took up the linoleum fifteen months before, were by now darkened with a layer of ingrained dirt. In shifts, we painstakingly sanded off that fifteen month layer of our life story with a palm sander. Dad's belt sander died ages ago, so, going through many sandpaper pads, we worked the floor with a little, zippy hand sander. It was slow and numbing. After finishing a shift, your hand/s would feel fat and clumsy - as though you had pins-and-needles - and itchy, as well! But it was soon done, being only a small space, and resulted in a floor that looked and smelled almost brand-new.

Then the sealant poured on and transformed the pale honey pine into rich, warm tones that deepened even to black over the knots in the timber. Shame about the smell!